CRAIGINMODDIE WINDFARM – Ex HADYARD HILL EXTENSION
February 22, 2021by DaillyParishCommunity News
CRAIGINMODDIE WINDFARM – Ex HADYARD HILL EXTENSION
Proposed windfarm, 14 turbines to a tip height of 200 metres with associated infrastructure and battery storage.
Dailly Community Council want to make sure that the community is aware of what could potentially be built next door to the existing Hadyard Hill windfarm. We do not feel that the developer has consulted enough with the community.
A new access track for abnormal loads/HGVs will be made from opposite No.1 Eldinton Terrace, up towards Craig, around Hadyard Hill towards Delamford and then on to the Site.
The turbines will be located behind Balcamie, near Dobbingstone and Delamford.
From the Crosshill / Girvan B741 and B7035 you will see and probably hear the turbines.
For more information use: https://www.energyconsents.scot/ApplicationDetails.aspx?cr=ECU00002196
To send either support or objection to the application it can be done via:
- Energy Consents Unit website at http://www.energyconsents.scot/Register.aspx
- email representations@gov.scot
- by post to the Scottish Government, Energy Consents Unit, 4th Floor, 5 Atlantic Quay, 150 Broomielaw, Glasgow, G2 8LU, identifying the proposal and specifying the grounds for representation
- to be received not later than 8th March 2021
If you would like more information or help, email: daillycc@outlook.com