Online Consultation Event
October 22, 2020by DaillyParishCommunity News
Online Consultation Event for the Proposed Carrick Wind Farm
Don’t forget that Scottish Power Renewables have an online consultation event for the Proposed Carrick Wind Farm.
This is on their website until 4 November: www.scottishpowerrenewables.com/carrickwindfarm
For your information, there are a number of wind farms being proposed in the area:
Craiginmoddie – 16 turbines, tip height up to 230m – behind Dobbingstone and on Craiginmoddie
Carrick – 13 turbines (reduced from 17) including battery storage, tip height up to 200m – east of Barr including the Pilot and Eldrick Hill
Clauchrie – 18 turbines, tip height up to 200m – south of Barr towards Barrhill, south side of Stinchar Valley over the ridge
Knockodhar – 32 turbines, tip height up to 200m – on the south side of Stinchar Valley
Kirk Hill has also been approved on appeal for 8 turbines, 115.5m tip height – west of High Newlands, north side of Water of Girvan.