2020 / 10

Village Litterpick

October 28, 2020by DaillyParishCommunity News

Village Litterpick

1st November

Meet up  – 11:00am at the Miner’s Memorial

 Please remember SOCIAL DISTANCING bring your own litterpicker if you have one. Wear old clothes / tough shoes /gloves. Extra litterpickers will be available . Please come along & help keep the village clean . All help much appreciated.

Online Consultation Event

October 22, 2020by DaillyParishCommunity News

Online Consultation Event for the Proposed Carrick Wind Farm

Don’t forget that Scottish Power Renewables have an online consultation event for the Proposed Carrick Wind Farm.

This is on their website until 4 November:   www.scottishpowerrenewables.com/carrickwindfarm

For your information, there are a number of wind farms being proposed in the area:

Craiginmoddie – 16 turbines, tip height up to 230m – behind Dobbingstone and on Craiginmoddie

Carrick – 13 turbines (reduced from 17) including battery storage, tip height up to 200m – east of Barr including the Pilot and Eldrick Hill

Clauchrie – 18 turbines, tip height up to 200m – south of Barr towards Barrhill, south side of Stinchar Valley over the ridge

Knockodhar – 32 turbines, tip height up to 200m – on the south side of Stinchar Valley

Kirk Hill has also been approved on appeal for 8 turbines, 115.5m tip height – west of High Newlands, north side of Water of Girvan.

About us

Welcome to the Dailly Parish community website!

The latest news will soon be displayed on this page so keep checking back for the latest local information for locals and visitors alike!